Turitea Wind Farm; Palmeston North, New Zealand

Turitiea Wind Farm

33kV, ±55Mvar

  • Design, Manufacture & Commission
  • PCC 220kV
  • Vestas New Zealand
  • Contract signed in September ‘2
  • 103MW addition to the existing 119MW capacity of the northern section of the wind farm
  • Vestas is the EPC contractor for the entire wind farm
  • Vestas Power Park Controller will be used
  • RXHK controller slave to VestasPPC

Contact us for more details about our solutions

Contact Us